Valentia Island, Co. Kerry

Valentia Island was the landing point for the Transatlantic Cables, starting with the attempts in 1852, until the successful cables of 1865-1866. The first message was sent on 11 Aug 1858, but that cable failed within a month. Shortly afterward, it was found easier to land them on the mainland at nearby points of Ballinskelligs and Waterville (1870). They were also landed at Ballycarbery and/or Cooncroum, on the mainland a bit north of Valentia, and then continued across the bay to Valentia [Hammond, p.149]. Service ended in 1966. There is a small museum near Knightstown, Valentia, and several of the buildings survive. The actual station near Waterville also survives.

See THIS LINK


Search the Gazetteer:

Gazetteer Index Main MacTutor index

An extract from The Mathematical Gazetteer of the British Isles created by David Singmaster

The original site is at THIS LINK